Rio Silver Inc. (CVE: RYO) Banks On Two Projects For Long Term Growth
Rio Silver Inc. (CVE: RYO) is not your typical exploration and mining company. Headquartered in Vancouver, Canada, the company has set sights on several prospective mining projects in Peru as part of its growth strategy. Its core business revolves around the advancement of exploration precious metals, primarily Silver along with Gold at its principle holdings in south central Peru.
Rio Silver Flagship Projects
Ninobamba Silver Project
Ninobamba Silver Project is the company’s flagship project located in a renowned silver and gold belt 330 kilometers south of Lima in Peru. Sitting on 3,933 hectares, the prospective project is best known more for silver than gold deposits. Rio Silver has rights to the silver project through its subsidiary Minera Rio Plata that owns 100% of the mineral rights.
Rio Silver is not the first company to purse precious metals, among other minerals, at the Ninobamba Silver project. AngloGold Exploration has already explored the field, focusing on an area with an intense hydrothermal surface alteration.
AngloGold company drilled five core holes totaling 861 meters. Previous assay results indicated prospects of 87 grams per ton silver over 130 meters drill interval. Bear Creek Mining, Newmont Mining Corp., and Southern Peru Copper Corp are some of the other companies that have carried out significant exploration operations at the project in addition to contributing millions in metallurgical and processing studies once the initial exploration data had been compiled.
The previous exploration programs have provided Rio Silver with data that has indicated 2 large silver and gold mineralized deposits resulting in highly prospective silver/gold targets for economic feasibility. Mineralization data has so far shown potential for outcropping as well as bulk tonnage at depth.
Previous samples taken have also shown prospects of mineralization at the North Zone of the Ninobamba Silver project covering 400 meters. Furthermore, trenching has uncovered silver mineralization for an additional 400 meters in the South Zone of the project. Resource potential reports for the area are next in line after these encouraging developments and a complete review of the over $10 million of historic work combined with computer modelling of all the compiled data existing to date for both the NinoBamba and neighboring Jorimina mineralized deposits, never before held by only one company.
The company has had earn-in joint venture partners in the past but Rio Silver has since moved on with the project and is planning to initiate the permitting process as it seeks to commence the first phase drill program at the prospective Ninobamba Silver/Gold project on their own, increasing the company’s value proposition.
To be Announced:
With additional goals of sustainability, the company is advancing certain initiatives soon to be concluded with news expected in the coming quarter.
Gerow Lake Project is a prospective copper-gold prospect that Rio Silver owns in Gerow Lake, Ontario, Canada. The company acquired rights to the 3,456 hectare mining property in 2006, buoyed by the potential for copper-gold mineralization. The staking of an additional 5,312 hectares, as well as the reconsolidation of a partners’ interest in 2009, resulted in the company controlling 100% interest in the prospect.
Rio Silver has already completed an airborne geophysical survey of the Gerow Lake Project. It is currently conducting consultation with stakeholders made up of MNDM and local First Nations as it seeks permission for plans to advance this exciting discovery. Exploration work will only commence upon the company reaching an agreement with all stakeholders.
Recent Developments
In the recent past, Rio Silver has carried out a capital raise drive through a non-brokered private placement of 10 million units made up of the company’s shares. Priced at $0.05 a unit, the company went on to raise $500,000 in gross proceeds.
The capital raise drive came as the company sought additional funds to continue works at the Ninobamba silver and gold project in Peru as well as new initiatives within Peru. Part of the funds will also go towards financing immediate financial obligations as well as for working capital and other new projects in Peru. The private placement comes hot on the heels of Rio Silver also settling an aggregate of $80,503 of debt through the issuance of 1.6 million common shares in the second quarter of the year.
Bottom Line
Rio Silver’s turnaround has started gathering pace after the stock hit the $0.025 mark earlier. Amidst this base line, Rio Silvers’ recent price activity has indicated the stock is on an upward momentum and gaining investor confidence. The bounce-back can be attributed to investors taking note of the company’s tremendous potential backed by prospective mining projects.
The future can only be bright for Rio Silver as it brings its flagship Ninobamba silver and gold property to fruition with the cash injection of $574,000 recently raised through an oversubscribed private placement program as well as advance plans for the Gerow Lake asset in Ontario, Canada.
https://www.riosilverinc.com/peru.php
https://www.riosilverinc.com/gerow_lake.php
https://www.riosilverinc.com/pdfs/Ninobamba-2017-Program.pdf
https://www.riosilverinc.com/pdfs/Rio-Silver-Announces-Private-Placement-Sep-2-2019.pdf
https://www.riosilverinc.com/pdfs/Rio-Silver-Completes-Shares-for-Debt-Transaction-Apr-18-2019.pdf
https://www.riosilverinc.com/pdfs/Rio-Silver-and-Norsemont-II-Agree-to-Terminate-LOI-Feb-22-2019.pdf
- Published in Mining, News Home, Rio Silver
Alliance Mining Initial Payment to Tiberius Gold Corp.
Momentum Public Relations
Press Release: February 20
Alliance Mining Corp. (TSX-v: ALM) (“Alliance” or the “Company”) is pleased to announce it has made the first payment of $250,000.00 by issuing 5 million common shares of its capital to Tiberius Gold Corp. in connection with the option agreement between Alliance Mining Corp. and Tiberius Gold Corp. Alliance may acquire 100 per cent of Tiberius’s property located in the centre of the Bissett gold mine camp in Manitoba. Under the agreement, Alliance may earn in a 100-per-cent interest in the property by making certain staged cash payments and/or share payments of common shares in the capital of Alliance to Tiberius over a four-year period equal to a total of $1.25-million as follows: (i) $250,000 in cash and/or common shares on or before 90 days of the TSX Venture Exchange’s approval of the transaction; (ii) $250,000 in cash and/or common shares on or before the first anniversary of the approval date; (iii) $250,000 in cash and/or common shares on or before the second anniversary of the approval date; $250,000 in cash and/or common shares on or before the third anniversary of the approval date; and $250,000 in cash and/or common shares on or before the fourth anniversary of the approval date.
The 5 million shares paid to Tiberius Gold Corp. are subject to a 4 month statutory hold period in accordance with applicable securities laws.
Alliance is actively seeking to expand its presence in the Bissett Gold camp through future property acquisitions and/or potential joint venture exploration partnerships with neighbouring companies. At present Alliance is actively working with its Manitoba based geological team to prepare for its upcoming exploration program.
Alliance Mining has an option to acquire 100 per cent of the Red Rice Lake property located in the centre of the Bissett gold camp in Manitoba. The property is located close to the town of Bissett, Man., and just four kilometres south of Klondex Mines’ producing True North gold mine.
The Red Rice Lake gold property claims are located within the Archean Rice Lake greenstone belt in southeastern Manitoba. This belt forms part of the Uchi sub province that includes the Red Lake and Pickle Crow belts in Northwestern Ontario.
ON BEHALF OF THE BOARD
Al Beaton PEng
Director
FOR FURTHER INFORMATION PLEASE CONTACT:
Alliance Mining Corp.
(604) 488-3900
Investor Relations:
Antony Claydon: 604-445-5421
E-mail: ir@alliancemining.com
This press release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts, that address future exploration drilling, exploration activities and events or developments that the Company expects, are forward looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include exploitation and exploration successes, continued availability of financing, and general economic, market or business conditions.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Alliance Mining Corp.
888 Dunsmuir Street – Suite 888, Vancouver, B.C., V6C 3K4
To view the associated document to this release, please click on the following link:
public://news_release_pdf/AllianceMining02202018.pdf
To view the original release, please click here
Source: Alliance Mining Corp. (TSX Venture:ALM)
To follow Alliance Mining Corp. on your favorite social media platform or financial websites, please click on the icons below.
- Published in Alliance Mining
Auxico Announces Results of Innovative Mettalurgical Testing
Momentum Public Relations
Press Release: February 6 2018
Auxico Resources Canada Inc. (CSE:AUAG) is pleased to announce results from innovative metallurgical testing conducted on its gold/silver properties located in the state of Sinaloa, Mexico.
Series of tests that have been conducted on gravity concentrates from the Campanillas and Aguamas properties have resulted in the recoveries of over 98% of gold and 87% of silver within the same leach. These tests have been conducted over the last year using a mix of acids composed of sulfuric acid and thioria. The extraction (less than one hour) is accelerated by the use of ultrasound technology and the process uses no external heat or pressure.
SAMPLE | Feed material % Au | Recovery % Au | Feed material % Ag | Recovery % Ag |
Aguamas | 0.01 | 98.00 | 0.08 | 88.76 |
Campanillas | 0.05 | 98.00 | 0.05 | 87.47 |
These results are highly encouraging, as the process will significantly reduce both capital and operating expenditures, while having a much smaller environmental footprint.
Qualified Person
This news release was reviewed and approved by Joel Scodnick, P.Geo., an independent consultant to Auxico, in his capacity as a Qualified Person, as defined by National Instrument 43-101.
ON BEHALF OF THE BOARD OF DIRECTORS
« signed »
Mark Billings
President, Auxico Resources Canada Inc.
mb@auxicoresources.com
Cell: +1 514 296 1641
About Auxico Resources Canada Inc.
Auxico Resources Canada Inc. (“Auxico”) in a Canadian company that was founded in 2014 and based in Montreal. Auxico is engaged in the acquisition, exploration and development of mineral properties in Mexico. The Company has a 100% interest in the Zamora Silver-Gold Property in Sinaloa, Mexico. Auxico will continue to identify and potentially acquire additional property interests and conduct exploration and evaluation of these properties to assess their potential.
The Canadian Securities Exchange (CSE) has not reviewed and does not accept responsibility for the adequacy or the accuracy of the contents of this release.
- Published in Auxico Resources, Mining
Inca One Gold Provides Review of Calendar 2017
Momentum Public Relations
Press Release: January 10, 2018
INCA ONE GOLD PROVIDES REVIEW OF CALENDAR 2017
Inca One Gold Corp. has provided an update on the milestones achieved in 2017 and its primary goal of profitability in 2018.
The year 2017 was a turnaround year for Inca One, with significant milestones accomplished as it continued toward its pursuit of profitability and its vision of becoming a leading commercial gold processor in Peru. In its third year of commercial operations, it focused on operating cost reductions, infrastructure upgrades and internal controls.
During 2017, the Chala One plant operated at an average throughput of 65 tonnes per day. Deliveries to Chala One were 22,921 tonnes, up from 15,447 tonnes in 2016, an increase of 48 per cent. Chala processed 23,708 tonnes of material in this year, up from 14,447 tonnes in 2016, an increase of 64 per cent. Gold production for the year was 9,927 ounces, up from 6,682 ounces produced in 2016, representing a 49-per-cent increase. Gross sales were approximately $13-million (U.S.), up from $9.0-million (U.S.) in 2016, an increase of 44-per-cent year over year. The increase in production can be attributed to the company’s skilled operators and having sufficient working capital to purchase ore and pay miners in a timely manner. This working capital was lacking in 2016 due to IGV (value-added tax) audits.
The year’s first milestone occurred in early January, 2017, with the receipt of a beneficial permit, making Chala One one of the few companies in Peru to complete the formalization process. The receipt of the beneficial permit allowed for the successful permitting of the company’s first major infrastructure project: the construction of an electrical power line. The power line was completed in July, and Chala One was connected to Peru’s national power grid in August. As a result, electrical and power cost savings to Chala One are approximately $18,000 (U.S.) per month with this conversion.
Another key infrastructure component was the expansion and upgrading of tailing facilities to increase capacity by approximately 90,000 cubic metres. The capital cost was approximately $313,000 (U.S.) and, at current throughput levels, tailing capacity will last approximately five years. Future expansion may be required sooner as throughput rates increase.
Additionally, to ensure a consistent supply of quality mineral to the processing plant, it was necessary to develop a comprehensive infrastructure of mineral buyers in each gold-rich area of Peru. Inca One’s network of mineral buyers had been using a fleet of leased vehicles to service existing zones and for exploring new zones to determine the viability of mineral supply. During the fourth quarter of 2017, the company negotiated the purchase of a fleet of well-maintained used vehicles for its team on the ground, reducing monthly lease costs by approximately $22,000 (U.S.), contributing to improved cost savings.
While infrastructure was a focus last year, the company also had a noteworthy improvement in production on a year-over-year basis. Ore purchasing, ore processing and gold production were consistent throughout the year and ore-purchasing margins were maintained over comparable periods on a year-over-year basis. Inca One was able to improve production despite an extraordinary rainy season in February, March and April due to the impact of El Nino.
Due to investment in infrastructure, the company’s business cycle has now been reduced from the 45-day turnaround in its first year to the current 21-day operating cycle of ore delivery to gold export. This represents a significant improvement as working capital will no longer be tied up for extended periods of time. Additionally, the back office in Peru is to be congratulated as they have been able to keep monthly IGV submissions and refunds current.
Looking ahead to 2018, the company anticipates further production growth and cost reductions. It has emerged from recent improvements and investments, following three years of consecutive commercial production, right-sized and with a fully integrated gold ore processing plant. Inca One is optimistic about its future and trusts that its foundation is strong and ready for growth.
Results of 2018 annual general meeting
On Dec. 13, 2017, the company held its annual general meeting in Vancouver, B.C. All resolutions were passed by the requisite majority. Grant Thornton LLP, chartered professional accountants, was reappointed as auditor of the company for the ensuing year and shareholders confirmed the company’s stock option plan.
Shareholders voted in favour of setting the number of directors at four and the following incumbent directors were re-elected: Edward Kelly, Bruce Bragagnolo, Rodney Stevens and Adrian Morger.
About Inca One Gold Corp.
Inca One is a Canadian-based mineral processing company. The company’s activities consist of the production of gold and silver from the processing of purchased minerals located in Peru. Peru is the sixth-largest producer of gold in the world and the Peruvian government estimates the small-scale mining sector accounts for a significant portion of all Peruvian gold production, estimated to be valued approximately $3-billion (U.S.) annually. The company purchases its minerals from government registered small-scale mining producers from various regions and processes it at its Chala One milling facility located in Chala, southern Peru.
- Published in Inca One Gold Corp
Majescor/Albert Mining Commences Exploration on its Quebec Diamond and Gold Properties
Majescor/Albert Mining Commences Exploration on its Quebec Diamond and Gold Properties
Momentum Public Relations
Press Release: June 27, 2017
Ottawa, Ontario / TheNewswire / June 27, 2017 – Majescor Resources Inc. /Albert Mining (“Majescor” or the “Corporation”) (TSX-V: MJX), an exploration mining Company and a leader in applying Artificial Intelligence and data mining technical services in the mining sector using its Computer Aided Resources Detection System (“CARDS”), is pleased to announce the initiation of its summer 2017 field program on its gold and diamond properties*, notably:
James Bay Kimberlite
The James Bay Kimberlite property which consists of 21 claims blocks (131 CDC claims) located in proximity to the Renard Diamond Mine and Stornoway’s Adamantin Project , will be investigated in early July through till sampling. Some of the glacial sediment samples will be collected immediately down ice from the 37 kimberlite targets that were identified and scored by rank of priority using the Computer Aided Resource Detection System (CARDS). This territory became a focal point for kimberlite exploration following the discovery of diamonds in the Renard and the Beaver Lake sectors. The helicopter-borne sampling will be carried out by two senior geologists and the samples will be promptly submitted to Overburden Drilling Management of Ottawa for the recovery and identification of kimberlitic indicator minerals.
Nelly Neilson gold and Laparre Kimberlite
Work on the two projects will be carried out in conjunction with exploration on the James Bay Kimberlite property. The Nelly Neilson and Laparre properties respectively cover anomalous gold grains and kimberlite indicator minerals in glacial sediment identified through previous regional sampling. The follow-up work will entail closely-spaced till sampling to confirm and better locate the source of the minerals. About ten till samples are planned at Laparre. Till fences, in contrast, are to be performed perpendicularly to the main ice flow at Nelly Neilson.
Currie-Madeleine Gold-Copper
The Currie-Madeleine property covers 4 gold targets, 1 copper target, and 2 copper-zinc targets, all generated by Albert Mining using its Computer Aided Resource Detection System (CARDS). It consists of 54 claims (CDC) distributed in two blocks for a total area of 3,030 hectares. The property is located in the Lebel-sur-Quevillion and Desmaraisville area and it rests on the prolific Archean Abitibi sub-province. Four gold showings grading over 1 g/t and two zinc showings grading over 1{92d3d6fd85a76c012ea375328005e518e768e12ace6b1722b71965c2a02ea7ce} have been reported in historical drill holes on the property. Many gold showings are described in the area and three gold deposits: Discovery, Lake Rose, and Flordin, are located within seven km of the property. After the compilation and integration of all geology and drilling reports, geophysical ground and recent airborne surveys, including data from adjacent properties, a first phase exploration program including field reconnaissance will be performed on the CARDS-generated targets. A high-resolution geophysical EM survey will follow. A detailed analysis of the data from the second phase will aid the company to re-evaluate the mineral potential of the property and determine the appropriate location and orientation of future drill holes.
Wachigabau Gold-Copper
The Wachigabau property covers 5 gold targets and 1 copper target selected from the CARDS computer program of Albert Mining. It consists of 33 map-designated claims (CDC), totaling 1,842.03 hectares. The property lies within the southern band (Caopatina Segment) of the Chibougamau-Matagami Archean greenstone belt. The Wachigabau property is located within a 15 km radius of 2 gold deposits (Short Lake & Mariposite) and 3 known gold and base metals showings (Lac Relique-Ouest, Simard & Lac Lapointe SE). A geochemical survey will be performed over the CARDS gold targets hidden below thick overburden so as to validate their mineral potential.
Mirabelli Gold
Majescor recently initiated its 2017 field season by completing detailed prospection and infill till sampling along the paved Radisson Road on its Mirabelli Property located in Quebec’s James Bay area. The suspected iron formation was observed in bedrock and samples were sent to the laboratory for gold and multi-element analysis. Till samples are being processed for recovery and identification of visible gold particles and heavy mineral fractions.
About Majescor Resources Inc.
Majescor is a junior mining exploration company with an extensive portfolio of gold and diamond properties in Quebec. Majescor also recently acquired assets from DIAGNOS Inc.’s mining division, including the Computer Aided Resources Detection System (“CARDS”). Majescor can count on a multidisciplinary team that includes professionals in geophysics, geology, Artificial Intelligence, and mathematics. The Corporation’s objective is to develop a new royalty stream by significantly enhancing and participating in the exploration success rate of mining.
The scientific and technical content of this release was approved by Grigor Heba, P.Geo. a qualified person as defined by the National Instrument 43-101. For further information, please consult Albert’s website https://albertmining.com/ or contact
Michel Fontaine
President and CEO of Majescor Resources Inc./Albert Mining Inc.
Telephone: 514-994-5843
Email: michel@majescor.com
Additional information about the Corporation is available under Majescor’s profile on SEDAR at www.sedar.com.
This news release contains certain “forward-looking statements” or “forward-looking information” (collectively referred to herein as “forward-looking statements”) within the meaning of applicable securities legislation. Such forward-looking statements include, without limitation, forecasts, estimates, expectations and objectives for future operations that are subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of the Company. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or are events or conditions that “will”, “would”, “may”, “could” or “should” occur or be achieved. This news release contains forward-looking statements, pertaining to, among other things, the following: the resumption of the trading of Majescor shares on the TSX Venture Exchange. Statements regarding future production, capital expenditures and development plans are subject to all of the risks and uncertainties normally incident to the exploration for and development and production of oil and gas that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. These risks include, but are not limited to, inflation or lack of availability of goods and services, environmental risks, drilling risks, regulatory changes and certain other known and unknown risks detailed from time to time in Majescor’s public disclosure documents, copies of which are available on Majescor’s SEDAR profile at www.sedar.com.
Although Majescor believes that the material factors, expectations and assumptions expressed in such forward-looking statements are reasonable based on information available to it on the date such statements were made, no assurances can be given as to future results, levels of activity and achievements and such statements are not guarantees of future performance. Majescor’s actual results may differ materially from those expressed or implied in forward-looking statements and readers should not place undue importance or reliance on the forward-looking statements. Statements including forward-looking statements are made as of the date they are given and except as required by applicable securities laws, Majescor disclaims any intention or obligation to publically update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. The forward-looking statements contained in this news release are expressly qualified by this cautionary statement.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Copyright (c) 2017 TheNewswire – All rights reserved.
- Published in Albert Mining, Mining, News Home
Sage Gold Closes Oversold Non-Brokered Flow-Through Private Placement
Sage Gold Closes Oversold Non-Brokered Flow-Through Private Placement
Momentum Public Relations
Press Release: June 23, 2017
TORONTO, ONTARIO–(Marketwired – June 23, 2017) – Sage Gold Inc. (“Sage Gold” or the “Corporation”) (TSX VENTURE:SGX) is pleased to announce that further to its press release dated June 13, 2017, it has completed the closing of its non-brokered flow-through private placement (the “Offering“). The Offering consisted of the sale of 8,075,897 flow-through common shares of the Corporation, at $0.24 for gross proceeds of $1,938,216 million.
Securities issued pursuant to the Offering shall be subject to a four-month plus one day hold period commencing on the Closing Date under applicable Canadian securities laws. In connection with the Offering, finder’s fees of $90,944 was paid in cash and 378,934 compensation warrants were issued to certain eligible finders. Each compensation warrant entitles the holder to one common share at an exercise price of $0.30 per share for a period of 36 months following the closing date, whereupon the options will expire. The outstanding shares after this financing are 76,562,680 shares. The Corporation intends to use the net proceeds from the Offering to incur Canadian Exploration Expenses (CEE) on its properties.
About Sage Gold
The Company is a mineral exploration and development company which has primary interests in near-term production and exploration properties in Ontario. Its main properties are the 100{92d3d6fd85a76c012ea375328005e518e768e12ace6b1722b71965c2a02ea7ce} Clavos Gold property (“Clavos Project“) in Timmins and the 100{92d3d6fd85a76c012ea375328005e518e768e12ace6b1722b71965c2a02ea7ce} owned Onaman property including the Lynx copper, gold, silver property and other exploration properties in the Beardmore-Geraldton Gold Camp.
Sage Gold currently plans to complete a reserve estimate and a prefeasibility study regarding the Clavos Project. In the event that a production decision is made that is not based on a feasibility study of mineral reserves demonstrating economic and technical viability prepared in accordance with National Instrument 43-101, readers are cautioned that there is increased uncertainty and higher risk of economic and technical failure associated with such production decisions.
Technical reports and information relating to the properties can be obtained from the System for Electronic Document Analysis and Retrieval (SEDAR) website at www.sedar.com and www.sagegoldinc.com.
CAUTIONARY STATEMENT
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain forward looking information and the Company cautions readers that forward-looking information is based on certain assumptions and risk factors that could cause actual results to differ materially from the expectations of the Company included in this news release. This news release includes certain “forward-looking statements”, which often, but not always, can be identified by the use of words such as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management’s expectations. Forward-looking statements include estimates and statements with respect to the Company’s future plans, objectives or goals, to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among other things, results of exploration, metallurgical processing, project development, reclamation and capital costs of the Company’s mineral properties, and the Company’s financial condition and prospects, could differ materially from those currently anticipated in such statements for many reasons such as, but are not limited to: failure to identify mineral resources; failure to convert estimated mineral resources to reserves; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; political risks; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets, inflation, changes in exchange rates; fluctuations in commodity prices; delays in the development of projects; capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry; and those risks set out in the Company’s public documents filed on SEDAR. This list is not exhaustive of the factors that may affect any of the Company’s forward- looking statements. These and other factors should be considered carefully and readers should not place undue reliance on the Company’s forward-looking statements. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
SGX Shares 76,562,680
Nigel Lees
President and CEO
416-204-3170
nlees@sagegoldinc.com
www.sagegoldinc.com